this causes a debug log line as the first message in every ue.log because
the loggers/loglevels aren't configured yet.
22:10:02.463396 [MAC ] [D] [ 0] Msg3 buffer flushed
the msg3_flush isn't needed because all variables are initialized.
- Avoid multiple lines per each SDU Rx or Tx
- log info relative to source and destination of each SDU
- log info relative to whether the Rx SDU has been forwarded into a tunnel
- log info relative to whether the Rx SDUs are being buffered.
This commit addresses the following points
- If a NAS-PDU IE is contained in the E-RAB RELEASE COMMAND message, the eNB shall pass it to the UE.
- Issue RRCConnectionReconfiguration for the DRB to be removed
- Cleaning of DRB in RLC and GTP-U
- Fix for Malformed E-RAB Setup Response upon reaching max. DRBs
* Match hex dump indentation with srslog.
* Port asn1 utils to use srslog. Converted logging functions from taking varargs to variadic template functions.
* Remove trailing new lines in log lines from asn1 utils.
* First round of upgrades to srslog to asn1 tests.
* Second round of porting asn1 tests to srslog.
- multiple tunnels per E-RAB
- data forwarding between connected GTPU tunnels
- forwarding GTPU End Marker between connected tunnels
- TeNB GTPU handles in-sequence delivery when multiple tunnels for the same ERAB exist.
this patch fixes an issue with TC_9_3_1_17 after the "send attach in RRC connected" issue
has been fixed. The TC failed because the UE would always attempt to re-attach, even
after receiving an explicit detach request WITHOUT re-attach from the network.
According to TS 24.301 Sec. 5.5.2.3.2 the handling of that message largely depends
on the detach cause sent by network. Since we don't currently parse and handle
that the simplest solution here is to just enter deregistered:::null.
The patch is also part of the fix for issue #2237
this is an attempt to fix issue #2237 that cause the UE to fail to
attach because the attach request wasn't resent after T3410+T3411
expired.
this was only because RRC wasn't idle at that stage and the attach
request generation was aborted.
The patch fixes this by passing the NAS PDU directly to RRC in
connected state.
The patch also converts the blocking PDU alloc to a non-blocking one.