The current TTI gap calculation assumes strict continuity
of radio time stamps, even when retuning, changing sample rate, etc.
This is certainly desireble but not necessaritly the case and may cause
issues when negative time gaps or too large gaps are detected and reported
to the stack.
this patch makes the assumption that valid TTI jumps are between 1ms
and 1s and that larger gaps are the result of screwed time-stamps
or too long radio operations.
the examples are commented but by just uncommenting those
two lines the user should be able to run a eNB and UE on the same
machine in SISO mode over ZMQ
extend GW-NAS interface to signal test mode activation.
The method is a noop in the normal GW but is implemented in
the TTCN3 DUT according to TS 36.509 for Mode B
This commit implements support for the CLOSE_UE_TEST_LOOP message.
Currently the mode is not saved and looping the data is not implemented.
Only the *_COMPLETE message is sent back as a response.
First of all, with this the NAS conformance tests pass with ciphering and
integrity turned on. Before only integrity was working.
Mainly the NAS was applying the integrity protection and/or ciphering
incorrectly because it wasn't taking the secuirty status of the PDUs
into account. Some where already correct, some not. The patch
streamlines the handling for all outgoing messages.
during deinit of the UE/eNB it could happen that the log_ptr
was already set to null but the stack thread was still accessing
it through log_h->info()
i've moved the old macro into a new header and used as as much
as possible. there are still places in the code where similar
macros are used but we would need to change the variable name
to replace them
previously the NAS would cancel a attach request procedure if the PLMN
is already selected. PLMN selection, however, in not necessarily happening
before requesting RRC to establish a connection.