* Added the appropriate code for handling and sending the
re-establishment procedure messages to rrc_ue.c/.h.
* Triggered RRC reconfiguration after the reception of RRC
re-establishment complete
* Refreshed K_eNB at the reception of re-establishment
request
* Changed the mapping of TEIDs to RNTIs in the GTP-U layer,
as the RNTI might change with reestablishment.
Bugfix the wrong ra_rnti calculation in ra_proc::state_pdcch_setup.
According to TS 36.321 Subsection 5.1.4 Random Access Response reception, we can see the formula on RA-RNTI, which is,
RA-RNTI= 1 + t_id + 10*f_id,
where t_id is the index of the first subframe of the specified PRACH (0≤ t_id <10), and f_id is the index of the specified PRACH within that subframe, in ascending order of frequency domain (0≤ f_id< 6). Then, reading the srslte source code, we can see that, the code should bugfix.
BTW, the wrong code can run normal for LTE_FDD, causing of the info_f_id = 0; but it should be wrong, when it is LTE_TDD.
if no cell/PLMN can be found if the UE is switched on, the UE was never
trying again.
In theory this would be handled by T3410, but the timer
is not started in case the PLMN search isn't done yet.
The current TTI gap calculation assumes strict continuity
of radio time stamps, even when retuning, changing sample rate, etc.
This is certainly desireble but not necessaritly the case and may cause
issues when negative time gaps or too large gaps are detected and reported
to the stack.
this patch makes the assumption that valid TTI jumps are between 1ms
and 1s and that larger gaps are the result of screwed time-stamps
or too long radio operations.
the examples are commented but by just uncommenting those
two lines the user should be able to run a eNB and UE on the same
machine in SISO mode over ZMQ